• news3
  • news2
  • news1
23 May 2019

Working on Live River

The removal of this reinforced concrete structure in a live river (River Arrow) required detailed liaison with local stakeholders and the innovative use of the AquaDam to manage water flows.  Silt containment measures proved most effective in mitigating any silt pollution downstream.  The project also required close working with the Environment Agency Fisheries team to carry out fish rescue in the works area. The removal of this reinforced concrete structure in a live river (River Arrow) required detailed liaison with local stakeholders and the innovative use of the AquaDam to manage water flows. Silt containment measures proved most effective in mitigating any silt pollution downstream. The project also required close working with the Environment Agency Fisheries team to carry out fish rescue in the works area.