• news3
  • news2
  • news1
08 December 2015

Watercourse Maintenance in Somerset

The project includes the removal of silt along a 2km stretch of the river using both floating plant and barges together with long reach excavators working from the bank.  The team will work closely with local landowners, the Parrett IDB and the Environment Agency. The project includes the removal of silt along a 2km stretch of the river using both floating plant and barges together with long reach excavators working from the bank. The team will work closely with local landowners, the Parrett IDB and the Environment Agency.